Tuesday, January 31, 2012

Fire and Life Safety -- January 31, 2012

A strategic objective of the Dent Renovation Project was to install a sprinkler system in the facility. This objective has overcome many obstacles in the road to conclusion. Today the underground water tank that will provide a supplemental source of water should the sprinkler system activate was delivered. One big water bottle.

The installation project -- digging the hole for the tank, shoring it, and piping the water to the pump unit in the Dent School boiler room, and providing an underground cable connection between the two School buildings is in the capable hands of Creative Pipe Fitting Solutions, Inc., Clinton, MD.



The contractor has begun work on the site; the tank will be buried under a section of the side yard play equipment between the Dent Building and the 214 Townhouse.


Site prep well underway. Monarc Construction built housing to protect the air condenser units.


Disassembled play equipment.


The water storage tank awaiting unloading.


Down the alley the tank comes!


The workmen were very careful to avoid the overhead power lines as well as protect the brick from the bulldozer treads.