Capitol Hill Day School Building Addition

Through the upcoming renovation of the Dent building, the School will realize a long term strategic goal of supporting and strengthening our programs by improving and updating our facility.


The School has established this blog to inform parents, friends, neighbors, and students of the status of the project. Please check the site often or subscribe to the RSS feed for notification of when new items are posted.

Monday, August 25, 2008

Calibrated Test -- Geothermal Well


Bowman Consulting and Northern Virginia Drilling completed a calibrated test of the well's capacity. Today's test, with the geologist's report, will confirm the well's potential as a source of water for the geothermal system. We have requested Northern Virginia Drilling complete one additional test to determine the well's potential as an ejection well. The drillers will pump water into the well to measure the speed at which the water is absorbed into the aquifer. The School is considering an "open loop" geothermal system with one well serving as the water source and the second well serving as the ejection well.

The picture shows the drilling team reading the pump dial and a sonic water level meter. The latter instrument measures the temperature of the water (55 degrees) and the level of the water table at various pump speeds (generally around 74' below the surface of the parking lot).

No comments: