FINAL REPORT Geothermal Test Well
Northern Virginia Drilling successfully installed a 4" PVC pipe in the existing well on Thursday, August 21st. The drillers estimate the flow at 120 gallons per minute, an excellent result that meets the requirements specified by our Mechanical, Electrical, and Plumbing (MEP) Engineer. The drilling equipment has been removed; some cleanup remains. Thanks to everyone for your patience.