Capitol Hill Day School Building Addition

Through the upcoming renovation of the Dent building, the School will realize a long term strategic goal of supporting and strengthening our programs by improving and updating our facility.


The School has established this blog to inform parents, friends, neighbors, and students of the status of the project. Please check the site often or subscribe to the RSS feed for notification of when new items are posted.

Wednesday, July 28, 2010

Dent School featured at Historical Society of Washington, DC Exhibit

The Historical Society of Washington's exhibit "Schools for All, A History of DC Public School Buildings," includes Capitol Hill Day School's Dent School Building. The program notes that "The preservation of these historic schools continues to enrich the District of Columbia both culturally and financially."

Richard Wallach, Washington DC's mayor (1861-1868) is given credit for launching the golden age of school construction in DC. The Franklin School at 13th and K Streets NW and the Charles Sumner School at 17th and M Streets, NW remain the most significant from an architectural perspective. Wallach School, built in 1864, the first constructed and named for the mayor, was replaced by Hine Junior High School. Other photos feature Lennox, Giddings, the original Brent School, and the "French School," now CHAW.

Many of these schools were designed by Adolf Cluss, a German immigrant who came to Washington to work as a draftsman and engineer at the Washington Navy Yard. As an architect he designed 90 buildings in DC of which 11, including Eastern Market, remain.

The exhibit is open from Sunday, July 18, and through September 26, 2010 at the Historical Society, 801 Street, NW, at Mount Vernon Square.

More information:

www.historydc.org

www.FranklinSchoolDC.org

Saturday, July 17, 2010

Capitol Hill Day School -- Technology on the March!


Capitol Hill Day School hired Community IT Innovators, Inc. (www.citidc.com) to complete an infrastructure upgrade to its computer network and hardware. With CITI's assistance we will enhance internet security, increase internet connectivity speed, replace a significant number of computer workstations, upgrade wireless connectivity, and install SmartBoards. CITI's on-site staff includes Galen Wenger, Systems Administrator, David Dawson, Senior Systems Engineer, and Nate Meyer, Systems Administrator.

The installation will be complete by the School's opening bell, Tuesday, September 6th.

Thursday, July 15, 2010

US Geological Survey Visit July 15, 2010

Hydrologic Technicians from the U.S. Geological Survey, MD-DE-DC Water Science Center, examined the School's well on July 15th to determine if it would be suitable for inclusion in an aquifer monitoring project that the USGS has undertaken to study the Patuxent Aquifer.

Kelly Young, the School's Office Manager (on right), uncapped the well for the Technicians to examine.

Today, July 15th, the static water level was 46' below ground level.

The well is 290' deep. Bedrock is 289'.